LS – P30

This Lock‑Out Procedures poster presents a clear 10‑step sequence for safely de‑energizing and securing equipment: identify energy sources and hazards, notify affected employees, shut down and isolate all energy, apply lockout devices, test controls and verify isolation, return controls to off, perform the task, and finally remove lockout devices only after reassembly and notification.

 

LS – P30

This Lock‑Out Procedures poster presents a clear 10‑step sequence for safely de‑energizing and securing equipment: identify energy sources and hazards, notify affected employees, shut down and isolate all energy, apply lockout devices, test controls and verify isolation, return controls to off, perform the task, and finally remove lockout devices only after reassembly and notification.

 

Detail

This Lock‑Out Procedures poster presents a clear 10‑step sequence for safely de‑energizing and securing equipment: identify energy sources and hazards, notify affected employees, shut down and isolate all energy, apply lockout devices, test controls and verify isolation, return controls to off, perform the task, and finally remove lockout devices only after reassembly and notification.

Size: 18” X 24”

 

Product Application

  • When & Where should use LOTO?
  • Daily maintenance, adjustment, cleaning, inspection and commissioning for equipment. Enter into the limited space, hot work, dismantling work and so on in the tower, tank, electrified body, kettle, heat exchanger, pumps and other facilities.
  • Operation involving high voltage. ( including the operation under the high-tension cable )
  • Operation require closing the safety system temporary.
  • Operation during maintenance and commissioning of non-processing.

How to buy the right product?