LS – P14
Lockout Tag out Donโt overload poster
One of the leading causes of electrical accidents is overloaded sockets and extensions.
size: 18โณx 24โณ
LS – P14
Lockout Tag out Donโt overload poster
One of the leading causes of electrical accidents is overloaded sockets and extensions.
size: 18โณx 24โณ
Detail
Lockout Tag out Donโt overload poster
One of the leading causes of electrical accidents is overloaded sockets and extensions.
size: 18โณx 24โณ

Product Application
- When & Where should use LOTO?
- Daily maintenance, adjustment, cleaning, inspection and commissioning for equipment. Enter into the limited space, hot work, dismantling work and so on in the tower, tank, electrified body, kettle, heat exchanger, pumps and other facilities.
- Operation involving high voltage. ( including the operation under the high-tension cable )
- Operation require closing the safety system temporary.
- Operation during maintenance and commissioning of non-processing.
